Scott's RV-14A Build
Home
(720 Total Hrs)
Avionics
(7.5 Hrs)
Fuselage
(14 Hrs)
Fwf
(159 Hrs)
Other
(18.5 Hrs)
Section 26
(3 Hrs)
Section 38
(9 Hrs)
Section 41
(5 Hrs)
Section 44
(5.5 Hrs)
Section 45
(13.5 Hrs)
Section 47
(5 Hrs)
Continued wiring right spark plug wires.
1 Jun 2023
2 hours
FWF
#June-2023
#wes-June-2023
Share
Wired left and right PMags. Tested operation and timed engine. Ran left PMag spark plug wires.
31 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Wired
30 May 2023
4.5 hours
FWF
#May-2023
#wes-May-2023
Share
Wired oil, manifold, and fuel pressure sensors. Wired
26 May 2023
7.5 hours
Avionics
#May-2023
#wes-May-2023
Share
Installed alternator. Installed prop.
24 May 2023
5.5 hours
FWF
#May-2023
#wes-May-2023
#Me
Share
Install oil cooler.
22 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Sand lower cowling repairs. Finish heater system. Install EGT probes.
19 May 2023
4 hours
FWF
#May-2023
#wes-May-2023
Share
Finished air ramps on upper cowling. Installed cooling louvers on lower cowling. Finished exhaust install. Started heat muff installation.
18 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Install oil door. Micro air ramps. Prepare lower cowling for cooling louvers. Install exhausts.
17 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Drilled holes for screws in lower cowl. Mixed microballons for air ramps. Worked on oil door.
12 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
� 2022
Design