Finished right intersection fairing. Added foam to upper cowling. Added oil to engine. Removed all spark plugs and emptied all oil. Replaced spark plugs and torqued to specs. Cranked and tested engines. Calibrated tanks.
23 Jun 2023
7.5 hours
FWF
#June-2023
#wes-June-2023
Share
Finished riveting spinner spacers. Added heat shield to lower cowling. Added front baffle seals to lower cowl and tested fit. Riveted nut plates to lower cowling nose gear doubler.
21 Jun 2023
7 hours
FWF
#June-2023
#wes-June-2023
Share
Continued spinner installation. Drilled holes and installed screws for front plate. Fabricated spacers and drilled holes x
15 Jun 2023
4.5 hours
FWF
#June-2023
#wes-June-2023
Share
Started spinner installation.
14 Jun 2023
4 hours
FWF
#June-2023
#wes-June-2023
Share
Bleed brakes. Install sniffle valve line and hose.
7 Jun 2023
4 hours
FWF
#June-2023
#wes-June-2023
Share
Completed spark plug wires. Installed oil cooler scat tube.
2 Jun 2023
3.5 hours
FWF
#June-2023
#wes-June-2023
Share
Continued wiring right spark plug wires.
1 Jun 2023
2 hours
FWF
#June-2023
#wes-June-2023
Share
Wired left and right PMags. Tested operation and timed engine. Ran left PMag spark plug wires.
31 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Wired
30 May 2023
4.5 hours
FWF
#May-2023
#wes-May-2023
Share
Installed alternator. Installed prop.
24 May 2023
5.5 hours
FWF
#May-2023
#wes-May-2023
#Me
Share