Install oil cooler.
22 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Sand lower cowling repairs. Finish heater system. Install EGT probes.
19 May 2023
4 hours
FWF
#May-2023
#wes-May-2023
Share
Finished air ramps on upper cowling. Installed cooling louvers on lower cowling. Finished exhaust install. Started heat muff installation.
18 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Install oil door. Micro air ramps. Prepare lower cowling for cooling louvers. Install exhausts.
17 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Drilled holes for screws in lower cowl. Mixed microballons for air ramps. Worked on oil door.
12 May 2023
6 hours
FWF
#May-2023
#wes-May-2023
Share
Attached air ramps to cowling. Install heat system T. Cut scat tubes. Cut exhaust hangers
11 May 2023
4.5 hours
FWF
#May-2023
#wes-May-2023
Share
Countersink rivet holes for cowling rivets. Rivet hinges to cowling. Begin air dam installation.
10 May 2023
5 hours
FWF
#May-2023
#wes-May-2023
Share
Continued baffle work. Finished drilling and prepping all hinge holes. Drilled, prepped for, and install nut plates.
5 May 2023
4.5 hours
FWF
#May-2023
#wes-May-2023
Share
Continued cowling work.
4 May 2023
3 hours
FWF
#May-2023
#wes-May-2023
Share
Drilled hinges to lower cowling.
2 May 2023
5.5 hours
FWF
#May-2023
#wes-May-2023
Share