Scott's RV-14A Build
Home
(240 Total Hrs)
Avionics
(7.5 Hrs)
Fuselage
(14 Hrs)
Fwf
(159 Hrs)
Other
(18.5 Hrs)
Section 26
(3 Hrs)
Section 38
(9 Hrs)
Section 41
(5 Hrs)
Section 44
(5.5 Hrs)
Section 45
(13.5 Hrs)
Section 47
(5 Hrs)
Finished right intersection fairing. Added foam to upper cowling. Added oil to engine. Removed all spark plugs and emptied all oil. Replaced spark plugs and torqued to specs. Cranked and tested engines. Calibrated tanks.
23 Jun 2023
7.5 hours
FWF
#June-2023
#wes-June-2023
Share
� 2022
Design
pdevty