Scott's RV-14A Build
Home
(240 Total Hrs)
Avionics
(7.5 Hrs)
Fuselage
(14 Hrs)
Fwf
(159 Hrs)
Other
(18.5 Hrs)
Section 26
(3 Hrs)
Section 38
(9 Hrs)
Section 41
(5 Hrs)
Section 44
(5.5 Hrs)
Section 45
(13.5 Hrs)
Section 47
(5 Hrs)
March drilled and installed wing root fairings. Added zip ties to left wing root wires. Fabricated and bonded wing root spacers
20 Jun 2023
5 hours
Section 41
#June-2023
#jared-June-2023
Share
� 2022
Design
pdevty