Scott's RV-14A Build
Home
(240 Total Hrs)
Avionics
(7.5 Hrs)
Fuselage
(14 Hrs)
Fwf
(159 Hrs)
Other
(18.5 Hrs)
Section 26
(3 Hrs)
Section 38
(9 Hrs)
Section 41
(5 Hrs)
Section 44
(5.5 Hrs)
Section 45
(13.5 Hrs)
Section 47
(5 Hrs)
Install wings
16 Jun 2023
3.5 hours
Fuselage
#June-2023
#wes-June-2023
#Me
Share
Installed alternator. Installed prop.
24 May 2023
5.5 hours
FWF
#May-2023
#wes-May-2023
#Me
Share
Finished red cube install. Installed blast tubes. Started preheat wiring.
11 Apr 2023
2 hours
FWF
#April-2023
#wes-April-2023
#Me
Share
Continued snorkel work. Rivet prop governor cable holder. Install prop governor.
4 Apr 2023
5.5 hours
FWF
#April-2023
#wes-April-2023
#Me
Share
Continued snorkel and baffle work.
3 Apr 2023
5.5 hours
FWF
#April-2023
#wes-April-2023
#Me
Share
Worked on baffles. Installed fuel servo. Connected mixture control cable. Connected fuel and oil pressure.
17 Mar 2023
5 hours
FWF
#March-2023
#wes-March-2023
#Me
Share
Prepped engine for installation. Installed engine.
13 Mar 2023
6.5 hours
FWF
#March-2023
#wes-March-2023
#Me
Share
� 2022
Design
pdevty